Case Studies
|
This outdoor school building was installed for a multitude of uses, but mainly as an outdoor teaching space. The challenge here was to ensure a safe permanent base foundation for the shelter |
view |
|
The school wanted to extend the amount of useful indoor space without additional building work being carried out to the main school. It was decided that the best course of action would be to |
view |
|
The customer required a to fit into an already developed space. They decided a pyramid shelter would be preferable due to the compact size of the structure. |
view |
|
We installed a compact hexagonal shelter in this case, for use mainly as a waiting shelter but also as a convenient extra space to be used for many different purposes. The structure was desig |
view |
|
Here the customer required a full sized outdoor shelter to be used for outdoor teaching as well as other purposes. After a consultation they decided to opt for a hexagonal outdoor shelter as |
view |
|
The case show here is the installation of a Glazed Pavillion Structure for multiple uses. |
view |
|
We were approached by St Catherine's School to modernise revamp the old play space. After the free initial consultation, we worked with the school to produce a unique playground design, i |
view |
|
The pupils at New Leake Primary School were fed up with their old, drab play space. After a free site survey and consultation with the teachers and staff, we developed a suitable plan for the |
view |
|
Elmhurst Primary School required a completely new playground. Bridge Timber Play designed, fitted and installed the whole play area including outdoor buildings and suitable safety flooring. |
view |
Get in touch with our team now on 01422 832863 to discuss your playground project...
- Professional Service and Expert Advice
- Comprehensive Maintenance Services
- Initial FREE NO OBLIGATION Site Surveys










